Difference between revisions of "Connector Mating System Maintenance"
Line 31: | Line 31: | ||
<br clear="all"/> | <br clear="all"/> | ||
− | [[image: | + | [[image:IMG_0952R.JPG | 400px |thumb |
| Side view along the front panel ]] | | Side view along the front panel ]] | ||
showing the hex front ends of all the connector mating shafts. Notice that even when well adjusted there may be small differences in how far each shaft end protrudes. | showing the hex front ends of all the connector mating shafts. Notice that even when well adjusted there may be small differences in how far each shaft end protrudes. | ||
Line 38: | Line 38: | ||
[[image:IMG_0953.JPG| 400px |thumb | [[image:IMG_0953.JPG| 400px |thumb | ||
| Inside top view of the shafts ]] | | Inside top view of the shafts ]] | ||
− | Looking back | + | Looking back towards the front panel from above the MCE, see that each shaft is held from moving out of the front of the box by a black steel split clamp. These clamps rest against the front inside of the MCE. The insertion force for the connectors arise in reaction from these clamps pushing on the front of the MCE top panel. |
<br clear="all"/> | <br clear="all"/> | ||
[[image:IMG_0954.JPG| 400px |thumb | [[image:IMG_0954.JPG| 400px |thumb | ||
− | | | + | | Inside view of shafts towards the rear. ]] |
+ | |||
+ | Looking out towards the cryostat, if one iwas present, from above the MCE, see a set of teflon washers and another set of black split-ring clamps. These clamps keep the shafts from moving towards the cryostat. The force to remove a connector from the cryostat arises in reaction to the force these rear rings apply to the housing. | ||
<br clear="all"/> | <br clear="all"/> | ||
[[image:IMG_0958.JPG| 400px |thumb | [[image:IMG_0958.JPG| 400px |thumb | ||
− | | Rear | + | | Rear split ring in compression ]] |
+ | |||
+ | Pressing the front panel hex heads brings the rear split ring into contact with the teflon washer and the Rear housing. | ||
<br clear="all"/> | <br clear="all"/> | ||
[[image:IMG_0959.JPG| 400px |thumb | [[image:IMG_0959.JPG| 400px |thumb | ||
− | | Rear | + | | Rear slit ring with shaft in tension ]] |
+ | |||
+ | Pulling on the front of the shaft can open a small gap at the rear before the front split ring come s into tension with the front of the MCE box. A gap of 1mm or so, as seen here, is typical. | ||
<br clear="all"/> | <br clear="all"/> | ||
[[image:IMG_0960.JPG| 400px |thumb | [[image:IMG_0960.JPG| 400px |thumb | ||
− | | | + | | Step 1 in shaft removal. ]] |
+ | To remove or re-position a shaft, first loosen the rear split ring. | ||
<br clear="all"/> | <br clear="all"/> | ||
[[image:IMG_0961.JPG| 400px |thumb | [[image:IMG_0961.JPG| 400px |thumb | ||
− | | | + | | Step 1 continued ]] |
+ | ..and slide it forwards. | ||
<br clear="all"/> | <br clear="all"/> | ||
[[image:IMG_0962.JPG| 400px |thumb | [[image:IMG_0962.JPG| 400px |thumb | ||
− | | | + | | Step 2 in shaft removal ]] |
+ | |||
+ | Then, loosen the front split ring. This might be a bit easier if you turn the shaft a few turns to allow the front ring to come away from the front wall. | ||
+ | Victor, who usually does this assembly and who, modestly, does not claim to do anything difficult, says this step requires a little bit of manual dexterity. | ||
<br clear="all"/> | <br clear="all"/> | ||
+ | |||
[[image:IMG_0963.JPG| 400px |thumb | [[image:IMG_0963.JPG| 400px |thumb | ||
− | | | + | | Step 2 Continued...]] |
+ | ..and slide it towards the back. | ||
<br clear="all"/> | <br clear="all"/> | ||
[[image:IMG_0964.JPG| 400px |thumb | [[image:IMG_0964.JPG| 400px |thumb | ||
− | | | + | | Step 3 in shaft removal]] |
+ | Now you can unthread the shaft and it becomes free to move forward. | ||
<br clear="all"/> | <br clear="all"/> | ||
[[image:IMG_0965.JPG| 400px |thumb | [[image:IMG_0965.JPG| 400px |thumb | ||
− | | | + | | Step 3 , view 2. at rear of MCE ]] |
+ | Notice that the shaft threads are '''LEFT HANDED!!''' THis is to keep the sense of which way to turn the bolt to tighten the connectors. (You are actually pushing, not pulling.) Remember, the teflon washers and split rings are all still on the shaft. If you are actually removing the shaft try not to drop all the bits down into the cards. | ||
<br clear="all"/> | <br clear="all"/> | ||
[[image:IMG_0968.JPG| 400px |thumb | [[image:IMG_0968.JPG| 400px |thumb | ||
− | | | + | | ]] |
<br clear="all"/> | <br clear="all"/> | ||
Line 97: | Line 112: | ||
<br clear="all"/> | <br clear="all"/> | ||
− | [[image: | + | [[image:IMG_0970R.JPG| 400px |thumb |
| Rear view of an MDM ]] | | Rear view of an MDM ]] | ||
Revision as of 19:13, 17 June 2014
in a filtered housing sitting on rails. A threaded shaft drives this connector towards or away from the cryostat.
The shaft pushes or pulls the filter/connector box w.r.t. the rest of the electronics. The flex electrical connector connects to the backplane.
Inside view of the housing showing a pair of slots for the rails per MDM and the hole for the bolt which keeps each filter/connector box from moving too far once installed.
This close up shows the rails and also the oval slot used to keep the filter from moving too far.
showing the hex front ends of all the connector mating shafts. Notice that even when well adjusted there may be small differences in how far each shaft end protrudes.
Looking back towards the front panel from above the MCE, see that each shaft is held from moving out of the front of the box by a black steel split clamp. These clamps rest against the front inside of the MCE. The insertion force for the connectors arise in reaction from these clamps pushing on the front of the MCE top panel.
Looking out towards the cryostat, if one iwas present, from above the MCE, see a set of teflon washers and another set of black split-ring clamps. These clamps keep the shafts from moving towards the cryostat. The force to remove a connector from the cryostat arises in reaction to the force these rear rings apply to the housing.
Pressing the front panel hex heads brings the rear split ring into contact with the teflon washer and the Rear housing.
Pulling on the front of the shaft can open a small gap at the rear before the front split ring come s into tension with the front of the MCE box. A gap of 1mm or so, as seen here, is typical.
To remove or re-position a shaft, first loosen the rear split ring.
..and slide it forwards.
Then, loosen the front split ring. This might be a bit easier if you turn the shaft a few turns to allow the front ring to come away from the front wall.
Victor, who usually does this assembly and who, modestly, does not claim to do anything difficult, says this step requires a little bit of manual dexterity.
..and slide it towards the back.
Now you can unthread the shaft and it becomes free to move forward.
Notice that the shaft threads are LEFT HANDED!! THis is to keep the sense of which way to turn the bolt to tighten the connectors. (You are actually pushing, not pulling.) Remember, the teflon washers and split rings are all still on the shaft. If you are actually removing the shaft try not to drop all the bits down into the cards.